The Challenge - With the environment at a waste water treatment plant, Vass built the enclosure for the 5600amp busbar out of 316 stainless steel.
EllisCo’s Role - Design and installation support from start to finish.


The Challenge - With the environment at a waste water treatment plant, Vass built the enclosure for the 5600amp busbar out of 316 stainless steel.
EllisCo’s Role - Design and installation support from start to finish.